Unverified50% confidenceTradeoffExact time
One practical approach to handling delayed ground truth: directly rewrite the evaluation record of the original run once the ground truth arrives; the advantage is a single source of truth, and the disadvantage is that it breaks the immutability of the evaluation history.
1
Sources
50%
Confidence
Medium-term (~90 days)
Relevance
10/12/2026
First Seen
Valid until: 1/10/2027
Sources
Related Entities
Related Claims
Unverified评估分数依赖测试数据集,数据集随业务变化会导致评分漂移,使历史横向比较产生误导71% similarUnverifiedWhen the backend returns a success, the data may not have actually been written to the source of record, so verifying the final state of the source of record is the ultimate basis for confirming whether the operation completed.71% similarUnverifiedTools like execution receipts prove the integrity of the record, not the correctness of the answer.71% similarUnverifiedEvaluating the effectiveness of a stock-picking method requires a complete historical record—including win rate, loss magnitude, maximum drawdown, and statistically tested excess returns—rather than carefully selected screenshots of price gains.68% similarUnverified历史记录同样受影响说明问题更可能出在前端的统一显示逻辑层,而非单次API请求失败68% similar
Cite This Claim
Stable URI
https://kongchang.com/claim/1011052API
curl https://kongchang.com/api/v1/knowledge/claims/1011052MCP
get_claim(id=1011052)