Unverified50% confidenceDecision RuleExact time
When evaluating where to deploy an Agent drafting loop, one should compare attempts per task and p95 wall-clock time rather than average latency, because retry storms hide in the tail.
1
Sources
50%
Confidence
Long-term
Relevance
10/16/2026
First Seen
Sources
Related Entities
Related Claims
UnverifiedFor small-to-medium-scale scraping tasks, it is recommended to start with 3–5 Workers, observe response status and quota consumption, and gradually scale up to avoid retry storms.68% similarUnverifiedThe number of Agent iterations is unpredictable, depending on task complexity, the quality of tool return results, and the model's own judgment; it may end in two rounds or still be looping after ten.68% similarUnverifiedIf an agent loop has no clear exit condition, it may retry indefinitely or stop prematurely due to mistakenly judging that it has completed, and common practices are to set a maximum step limit, a maximum token or time budget, and explicit success determination conditions.64% similarUnverifiedExcessively long agent reasoning chains can lead to error accumulation, so engineering practices typically incorporate safety mechanisms such as maximum loop counts and manual confirmation at key nodes.64% similarUnverified路由器本身的推理延迟需控制在被路由任务P50延迟的5%以内,否则会抵消成本节省价值64% similar
Cite This Claim
Stable URI
https://kongchang.com/claim/1042575API
curl https://kongchang.com/api/v1/knowledge/claims/1042575MCP
get_claim(id=1042575)