Unverified50% confidenceSolutionExact time
Carbon-aware scheduling is especially feasible for batch tasks (training, offline inference, data preprocessing), which can be delayed by several hours to wait for peaks in wind and solar output.
1
Sources
50%
Confidence
Long-term
Relevance
10/23/2026
First Seen
Sources
Related Entities
Related Claims
UnverifiedTemporal等现代工作流引擎原生支持Human Task节点,可将等待时间延伸至数天乃至数周而不丢失中间状态66% similarUnverifiedn8n's Schedule Trigger supports trigger interval granularities such as seconds, minutes, hours, days, weeks, and months.66% similarUnverifiedCarbon-aware scheduling requires hourly or even five-minute-level grid signals, not annual averages.65% similarUnverifiedThe startup and shutdown time of natural gas combined cycle gas turbine (CCGT) units can be controlled within a range of minutes to hours, making them more flexible than coal-fired power plants.64% similar
Cite This Claim
Stable URI
https://kongchang.com/claim/1088886API
curl https://kongchang.com/api/v1/knowledge/claims/1088886MCP
get_claim(id=1088886)