In the United States, generation or storage projects must submit interconnection applications to regional grid operators (such as PJM, CAISO, ERCOT, etc.) before connecting to the grid, and can only sign interconnection agreements after passing multiple rounds of review.
1
Sources
50%
Confidence
Long-term
Relevance
10/29/2026
First Seen
Sources
Related Entities
Related Claims
UnverifiedNew generation projects in the United States must go through interconnection application, system impact study and agreement signing before connecting to the transmission grid, and queue times in many regions have stretched to several years.75% similarUnverified在美国,电网接入过程由联邦能源管理委员会(FERC)监管,各区域传输组织(RTO)负责具体执行72% similarUnverifiedA large transmission project often has to simultaneously navigate the Federal Energy Regulatory Commission (FERC), state public utility commissions along its route, and local land-use permits.71% similar
Cite This Claim
Stable URI
https://kongchang.com/claim/1110710API
curl https://kongchang.com/api/v1/knowledge/claims/1110710MCP
get_claim(id=1110710)