Unverified50% confidenceBenchmarkExact time
On text-to-image generation tasks, SpecSlot surpasses JiT-B/8 on DPG-Bench with 40.6% lower forward cost, leading by 1.06.
1
Sources
50%
Confidence
Medium-term (~90 days)
Relevance
10/30/2026
First Seen
Valid until: 1/28/2027
Sources
Related Entities
Related Claims
UnverifiedOn ImageNet-512, the FID gap between SpecSlot and JiT-B/16 is only 0.69, while the computational cost is 38.2% lower.75% similarUnverifiedOn Terminal Bench, Fable 5.1's score is approximately 20 points higher than Grok 4.7's, representing close to a 50% improvement.59% similarUnverifiedUnder an 18k character budget, anchored hybrid retrieval achieved 36.18% accuracy, BM25 achieved 35.98%, while the best direct planner-guided method reached only 34.19%.58% similarUnverified该平稳性条件在 4×7 的被控对象与延迟网格、22 个横跨七个数量级的价格上,精确复现了离散扫描的最优解,最差偏差 0.0000,网格分辨率 0.02。57% similarUnverifiedd1-3B averages 74.1 across 11 image benchmarks, versus 73.9 for LFM2.5-VL-3B; on VL-RewardBench d1-3B scores 65.0, far ahead of LFM2.5-VL-3B's 50.9, but it lags on CV-Bench (82.1 vs 87.6), VisualWebBench (71.4 vs 78.3), and POPE (88.5 vs 90.1).57% similar
Cite This Claim
Stable URI
https://kongchang.com/claim/1115724API
curl https://kongchang.com/api/v1/knowledge/claims/1115724MCP
get_claim(id=1115724)