Unverified50% confidenceFactExact time
A drop in p95 task completion time from 29.5 minutes to 15.7 minutes is equivalent to roughly a 47% reduction in wait time for the slowest 5% of tasks.
1
Sources
50%
Confidence
Long-term
Relevance
11/1/2026
First Seen
Sources
Related Entities
Related Claims
UnverifiedIn DeepSeek's own simulated tests, dsh-superagent's p95 task completion time dropped from 29.5 minutes to 15.7 minutes.73% similarUnverifiedGoing from 4.1 seconds to 1.7 seconds represents a reduction in load time of approximately 58%.73% similarUnverifiedIn the hanging-provider test, the p95 wait times for direct connection and the proxy were 53.7 seconds and 53.6 seconds respectively, with only 2 calls from the proxy reaching the hanging provider (versus 30 for direct connection), but the circuit breaker never opened, because with a 30-second timeout it takes 5 failures, i.e. 150 seconds of hanging, to trigger.73% similarVerifiedAfter switching to Plan B, scene loading time was reduced from 3.3 seconds to approximately 0.5 seconds, approximately 6.8 times faster.72% similarUnverifiedLatency perception depends heavily on context, and there is no universal number of milliseconds; the engineering goal should target a comfortable range of about 1.5 seconds; consistency matters more than peak speed, and attention should be paid to P99 latency rather than peak speed.71% similar
Cite This Claim
Stable URI
https://kongchang.com/claim/1122909API
curl https://kongchang.com/api/v1/knowledge/claims/1122909MCP
get_claim(id=1122909)