Unverified50% confidenceDecision RuleExact time
Information such as project-related paths, branches and environment variables should be injected by the host at runtime; skill files only declare which context is needed and do not store specific values.
1
Sources
50%
Confidence
Long-term
Relevance
11/12/2026
First Seen
Sources
Related Entities
Related Claims
UnverifiedThe project annotates each skill with its applicable scenarios and the problems it can solve, allowing developers to understand the skill's task type, specific problems, and boundaries before selecting it.75% similarUnverifiedThe essence of interviewers' follow-up questioning on project details is to examine engineering rigor and to distinguish demo-level projects from enterprise-deliverable projects; enterprise-level projects must answer questions on exception path handling, data isolation across tenants and permission model design.74% similarUnverified项目分解智能体会先分析用户原始需求,主动提出多个细化方向供选择确认,最终生成清晰的项目目标清单,对应Agent架构中规划层的任务分解能力(Task Decomposition)74% similarUnverifiedAfter a Skill is loaded, it will indicate that a briefing is missing and require the user to provide a clear design intent; the Skill provides a framework, but what to build still depends on the developer.72% similarUnverifiedDuring engineering implementation, the folder structure should be clear (scripts, reference materials, and templates each in their proper place), the invocation conditions and paths of each file should be explicitly declared in SKILL.md, and the description should be repeatedly refined around actual task scenarios.72% similar
Cite This Claim
Stable URI
https://kongchang.com/claim/1164628API
curl https://kongchang.com/api/v1/knowledge/claims/1164628MCP
get_claim(id=1164628)