Unverified50% confidenceOpinionExact time
A 60% true positive rate is above the middle level for LLM-generated tests, but is not yet sufficient to serve as a hard gate blocking merges, and is better suited as an auxiliary signal.
1
Sources
50%
Confidence
Medium-term (~90 days)
Relevance
11/16/2026
First Seen
Valid until: 2/14/2027
Sources
Related Entities
Related Claims
UnverifiedIn settings where the test risk is definable, the naive threshold-selection baseline exceeds the target risk level in about half of the cases, whereas the Learn Then Test (LTT) method exceeds it in only 7.8% of the cases.75% similarUnverifiedTested on six widely used LLMs, the inconsistency rate ranges from 20.84% to 29.44%.74% similarUnverifiedWhen the LSTM was coupled with Gaussian process regression, the standard deviation deviation decreased by 56.5%, which was the most reliable configuration in the tests.70% similarUnverifiedSetting an absolute failure count ceiling for small-sample slices is more robust than setting a percentage threshold and is insensitive to sample size69% similar
Cite This Claim
Stable URI
https://kongchang.com/claim/1175312API
curl https://kongchang.com/api/v1/knowledge/claims/1175312MCP
get_claim(id=1175312)