Unverified50% confidenceFactExact time
Unless P=NP, no polynomial-time algorithm can approximate planning width with a one-sided approximation factor of o(N) or a symmetric approximation factor of o(√N).
1
Sources
50%
Confidence
Long-term
Relevance
11/20/2026
First Seen
Sources
Related Entities
Related Claims
UnverifiedA simple estimation method can simultaneously achieve a one-sided approximation factor of o(N) and a symmetric approximation factor of o(√N), indicating that the approximation hardness bounds are tight.73% similarUnverifiedThe open problems left by the paper include whether quasipolynomial time can be improved to polynomial time, and whether the algorithm applies to ℓp norms (p≠∞).69% similarUnverifiedMaximizing submodular functions is a classic NP-hard problem, but parameters such as curvature can be used to design greedy algorithms with approximation guarantees.66% similarUnverifiedInformation-theoretic lower bounds characterize the best performance achievable by any algorithm (even exponential-time) without computational resource constraints, corresponding in this problem to Õ(md+k); computational lower bounds, by contrast, assume the algorithm must run in polynomial time, and the resulting bounds are usually larger.65% similarUnverifiedFor suitably highly structured sequences, the new algorithm runs in quasi-linear time and requires only polylogarithmic space.65% similar
Cite This Claim
Stable URI
https://kongchang.com/claim/1190927API
curl https://kongchang.com/api/v1/knowledge/claims/1190927MCP
get_claim(id=1190927)