Unverified50% confidenceFactExact time
In the Neon Cube test, Astra spent 100 dollars to complete the first version and ultimately used up the entire 200-dollar budget; Sol took 9 hours to spend the first 100 dollars and ultimately spent only 145 dollars.
1
Sources
50%
Confidence
Short-term (~14 days)
Relevance
11/21/2026
First Seen
Valid until: 12/5/2026
Sources
Related Entities
Related Claims
UnverifiedIn the neon cube shooter, Astra used up the entire $200 budget, while Sol ultimately spent only $145; Astra implemented a custom shader for ground puddle reflections of signs and buildings, while Sol only had faint reflections from streetlights.77% similarUnverifiedClock-building test costs: Astra $18, Sol less than $5; among historical results, Fable 5.2 was $36, Opus 5.5 was $42, GPT-6 Astra was $30, Kimi was $16, and Fable 5.1 was $125.73% similarUnverifiedIn developer Jazzy's pixel city test, Neon took about 20 minutes and cost about 3.50 US dollars, while Opus took 18 minutes and cost about 7.20 US dollars; Jazzy found Neon's detail density astonishing but considered Opus better overall.72% similarUnverifiedTotal bill across the three tests: Astra spent 419 dollars and Sol spent 197 dollars.72% similarUnverifiedAt the ultra-high thinking setting, Neon cost $6.44 per task to complete the full benchmark suite, 36% cheaper than Opus 5.5 Max's $10.04, and its time to first answer was six times faster (56.5 seconds vs 338.6 seconds); GPT 6.2 Sol cost $2.10 per task, but Neon's output speed of 110 tokens per second was 47% faster.71% similar
Cite This Claim
Stable URI
https://kongchang.com/claim/1195578API
curl https://kongchang.com/api/v1/knowledge/claims/1195578MCP
get_claim(id=1195578)