Verified80% confidenceFactTime unknown
The PUE of traditional air-cooled data centers is typically between 1.3 and 1.5, while facilities using advanced liquid cooling technology can reduce PUE to below 1.1.
6
Sources
80%
Confidence
Long-term
Relevance
6/1/2026
First Seen
Sources
Related Entities
Related Claims
Unverified液冷和浸没式冷却方案可以将数据中心PUE降至1.1以下79% similarUnverifiedTraditional air-cooled data centers have a PUE of approximately 1.3–1.5, and evaporative cooling systems may consume millions of gallons of water per day79% similarUnverifiedTwo-phase immersion liquid cooling can reduce PUE to near the theoretical limit of 1.02 to 1.03.71% similarUnverifiedImmersion liquid cooling removes heat by exploiting the thermal conductivity of liquid, which is approximately 25 times higher than that of air, and can reduce PUE to near the theoretical limit of 1.0.62% similar
Cite This Claim
Stable URI
https://kongchang.com/claim/29381API
curl https://kongchang.com/api/v1/knowledge/claims/29381MCP