Unverified50% confidenceFactExact time
In industrial ML projects, data engineering and deployment operations typically account for more than 80% of total man-hours, far exceeding model training itself.
1
Sources
50%
Confidence
Long-term
Relevance
7/19/2026
First Seen
Sources
从零手写还是直接用sklearn?ML工程师学习路径完全指南
Related Claims
Unverified蒸馏攻击通过大规模API调用收集输入-输出对,训练效率可能是常规预训练数据的数十倍68% similarUnverifiedData scientists and ML engineers may spend over 70% of their time on data understanding and preprocessing rather than model training67% similarUnverifiedAccording to a Google research report, the actual model training code in a production-level ML system often accounts for only 5% of the overall engineering effort, with the remaining 95% being supporting engineering infrastructure.67% similarUnverifiedIn actual Agent Tuning projects, the total cost of data preparation, hyperparameter tuning, and multiple experimental iterations is typically 5–10 times that of a single training run66% similarUnverifiedLarge models can be used to automatically generate synthetic training data based on domain documents to construct question-answer pairs, and typically thousands to tens of thousands of training pairs are needed to achieve significant results.66% similar
Cite This Claim
Stable URI
https://kongchang.com/claim/556658API
curl https://kongchang.com/api/v1/knowledge/claims/556658MCP
get_claim(id=556658)