Unverified50% confidenceFactExact time
GPU集群的采购周期通常长达12至18个月(从订单到部署)
1
Sources
50%
Confidence
Long-term
Relevance
7/19/2026
First Seen
Sources
Related Claims
UnverifiedGPU通常在购入后18到24个月内就会因新一代架构发布而出现显著的性能贬值80% similarUnverifiedThe technology iteration cycle for AI-specific hardware such as GPUs may be as short as 18 to 24 months.76% similarUnverifiedGPU servers are typically depreciated on a straight-line basis over 3 to 5 years, while customer computing power lease contracts are usually only 1 to 2 years, creating a temporal mismatch between assets and liabilities.72% similarUnverified硬件公司从设计到客户验收的周期通常长达18-24个月70% similarUnverified自购GPU硬件只有在高利用率的场景下才有经济意义,对每月只跑二三十小时的团队即使假设显卡5年不贬值也需要将使用时长提高到约4倍才能与租赁打平69% similar
Cite This Claim
Stable URI
https://kongchang.com/claim/563043API
curl https://kongchang.com/api/v1/knowledge/claims/563043MCP
get_claim(id=563043)