Unverified50% confidenceFactExact time
In July 2023, Lockheed Martin was awarded a contract of approximately $499 million to build the ARIES experimental flight vehicle equipped with a nuclear thermal rocket engine, with the nuclear fission reactor designed and manufactured by BWX Technologies using HALEU fuel.
1
Sources
50%
Confidence
Medium-term (~90 days)
Relevance
8/30/2026
First Seen
Valid until: 11/28/2026
Sources
Related Entities
Related Claims
UnverifiedThe Electron-Ion Collider (EIC) is a next-generation nuclear physics facility under construction at Brookhaven National Laboratory in the United States, expected to begin operation in the early 2030s, with a budget of approximately 2 billion dollars.57% similarUnverified通用汽车投入超过350亿美元研发Ultium纯电架构55% similarUnverified太阳核心通过质子-质子链反应进行核聚变,每秒将超过400万吨物质转化为能量,总功率达3.8×10²⁶瓦特52% similarUnverified尼米兹级航母满载排水量超过10万吨,由两座A4W核反应堆驱动,可持续运行超过20年无需更换核燃料51% similar
Cite This Claim
Stable URI
https://kongchang.com/claim/825711API
curl https://kongchang.com/api/v1/knowledge/claims/825711MCP
get_claim(id=825711)