Unverified50% confidenceFactExact time
The traditional SDLC contains six phases—planning, design, build, test, deploy, and maintenance—with the build phase being the most time-consuming and costly.
1
Sources
50%
Confidence
Long-term
Relevance
9/8/2026
First Seen
Sources
Related Entities
Related Claims
Unverified多IDE协同开发的标准流程为五步:架构设计、分工编写、汇总代码、统一调试、成品运行63% similarUnverifiedTraeHarness divides the development process into four phases: requirements analysis, solution design, execution scheduling, and quality acceptance.58% similarUnverifiedThe loop engineering framework contains four core components: goal, acceptance, check, and budget.58% similarUnverifiedBuilding usable software involves at least five major stages: defining requirements, analysis and design, writing code, testing and validation, and deployment and launch57% similar
Cite This Claim
Stable URI
https://kongchang.com/claim/879658API
curl https://kongchang.com/api/v1/knowledge/claims/879658MCP
get_claim(id=879658)