Unverified50% confidenceFactExact time
'Critical' is the highest risk level in the Preparedness Framework.
1
Sources
50%
Confidence
Long-term
Relevance
9/11/2026
First Seen
Sources
Related Entities
Related Claims
UnverifiedThe Preparedness Framework sets capability levels for high-risk domains, typically divided from low to high into the tiers 'low,' 'medium,' 'high,' and 'critical.'71% similarUnverifiedA model reaching the Critical level means it possesses the potential, in specific capability dimensions, to cause serious and large-scale harm.68% similarUnverifiedThe Preparedness Framework stipulates that only models with a risk rating of medium or below may be deployed; higher ratings require additional mitigation measures, and models rated critical may not be deployed or further developed at all.66% similarUnverifiedThe main challenges facing Risklytics include reliance on scarce frontier-risk underwriters, the difficulty of building a composite team that understands both technology and insurance, and the possibility that the high volatility of frontier technology could trigger large-scale claims that threaten business sustainability.64% similarUnverifiedUnder the logic of the Preparedness Framework, once a capability reaches a high-risk level, OpenAI is required to deploy safety mitigations to reduce deployment risk to an acceptable level before large-scale release.64% similar
Cite This Claim
Stable URI
https://kongchang.com/claim/901461API
curl https://kongchang.com/api/v1/knowledge/claims/901461MCP
get_claim(id=901461)