Concept平准化成本 / Levelized Cost of Energy

LCOE

Levelized Cost of Energy (LCOE) is a metric for the total per-unit-energy cost of a generation or storage asset over its full lifecycle, incorporating capital expenditure, operations and maintenance costs, fuel costs, and cost of capital. It serves as a standard economic comparison tool in power system planning.

Timeline (last 90 days)

Oct 17

The levelized cost of electricity (LCOE) covers full life-cycle investment, operations and maintenance, and fuel costs divided by total generation.

Unverified50%
Oct 17

LCOE does not account for system costs such as reserve capacity, energy storage, and transmission upgrades required to connect intermittent power sources to the grid.

Unverified50%
Oct 17

A lower LCOE for photovoltaics than for nuclear power does not equate to a lower total cost for the power system.

Unverified50%