Unverified50% confidenceFactExact time
Brock's timing data shows: the planning phase takes a few minutes, UI design iterations take a few to a dozen-plus minutes, feature implementation can take 17 to 20 minutes per run, and the complete project took about 14 days from conception to App Store submission.
1
Sources
50%
Confidence
Medium-term (~90 days)
Relevance
10/20/2026
First Seen
Valid until: 1/18/2027
Sources
Building and Shipping a Mobile App from Scratch with Codex and GPT-6 Astra: The Full Workflow
bilibiliAIDeepCoder10/8/2026
Related Entities
Related Claims
Unverified借助 Dify 工作流,电商 APP 迭代的测试工时可从传统的约 2.5 天压缩到不到 1.5 小时(用例编写从0.5天到15分钟,自动化脚本从1天到30分钟,性能报告分析5分钟)78% similarUnverifiedManually walking through a moderately complex app may take 4–8 hours, while structured tools can compress the time to a few minutes.77% similarUnverified上传到App Store Connect后,包体处理阶段大约需要3-5分钟完成77% similarUnverifiediOS App Store reviews typically take 24–48 hours.72% similar
Cite This Claim
Stable URI
https://kongchang.com/claim/1076605API
curl https://kongchang.com/api/v1/knowledge/claims/1076605MCP
get_claim(id=1076605)