For data centers, the feasibility of demand-side management is disputed: inference services usually require low latency and continuous availability, leaving limited room for interruptible load; but training tasks, batch jobs, and some non-real-time inference have a certain degree of temporal flexibility.
1
Sources
50%
Confidence
Long-term
Relevance
10/21/2026
First Seen
Sources
Related Entities
Related Claims
UnverifiedPolling at a fixed interval has two problems: when there are many tasks it causes a large number of invalid requests that consume quota and may even trigger rate limiting; when tasks take a long time it may lengthen the total waiting time76% similarUnverifiedIf the financing environment tightens, some planned data center projects may be postponed or canceled, which in the short term may ease concerns about compute oversupply but in the long term may cause insufficient compute supply.76% similarUnverifiedData breadth is critical for the instruction-following task, while breadth is nearly redundant for the high-risk task.72% similarUnverified'Slowing down' lacks an actionable definition, and no consensus has been reached on which metrics to slow (model parameter scale, training compute investment, or capability release schedules).71% similar
Cite This Claim
Stable URI
https://kongchang.com/claim/1083614API
curl https://kongchang.com/api/v1/knowledge/claims/1083614MCP
get_claim(id=1083614)