Unverified50% confidenceOpinionExact time
The budget pool design of hierarchical budgets draws on the ideas of "zero-based budgeting" and "rolling budgeting" from financial management; quotas are not locked down once and for all, but adjusted with the project cycle.
1
Sources
50%
Confidence
Long-term
Relevance
11/2/2026
First Seen
Sources
Related Entities
Related Claims
UnverifiedThe VRAM budget should equal model weights plus KV cache; it is not sufficient to calculate only the weights.73% similarUnverified预留收尾预算的方案是:预算触顶后阻止新工作,但保留一小笔预算用于保存状态或返回部分结果72% similarUnverified纯硬性预算限额实现简单且边界清晰,但完全不考虑任务进度,可能导致前期投入变成沉没成本72% similarUnverifiedConcurrency budgets control how many sessions are consuming resources at the same time, which is rate control; token budgets and dollar budgets control how much can be spent in total, which is total-volume control; risk budgets constrain which operations require approval or must be rollback-able.67% similar
Cite This Claim
Stable URI
https://kongchang.com/claim/1127365API
curl https://kongchang.com/api/v1/knowledge/claims/1127365MCP
get_claim(id=1127365)