Unverified50% confidenceFactExact time
By improving the sampling process, while keeping the same weights, the nominal maximum layer-evaluation budget required for about 96% accuracy dropped from 60,000 (100 attempts × 50 steps × 12 layers) to 1,200 (5 attempts × 20 steps × 12 layers), roughly a 50-fold reduction.
1
Sources
50%
Confidence
Medium-term (~90 days)
Relevance
11/8/2026
First Seen
Valid until: 2/6/2027
Sources
Related Entities
Related Claims
UnverifiedWhen the sample size is small (e.g., only 5–10 successful requests), quantile estimation errors can be large; numpy.percentile or a larger sample size can be used to improve reliability.77% similarUnverified运行10次测试置信区间宽度约±31%,100次收窄至±10%,400次进一步收窄至±5%,推荐关键测试用例至少运行20-50次75% similarUnverifiedThe accuracy data in the test has an error margin of approximately ±8–10 percentage points at n=100 sample size (based on a 95% confidence-level binomial confidence interval).74% similarUnverifiedOn a benchmark of 23 test scenarios and two tools, the strategy of "intercept on any change to the full set" had a false positive rate of 50%.74% similarUnverifiedIn comparisons with optimizers using the same criterion, the hybrid method won 6, tied 41 and lost 19 of 66 Holm-corrected accuracy comparisons.73% similar
Cite This Claim
Stable URI
https://kongchang.com/claim/1148313API
curl https://kongchang.com/api/v1/knowledge/claims/1148313MCP
get_claim(id=1148313)