Unverified50% confidenceBenchmarkExact time
The expected worst-case actual cost when evaluation times are chosen post hoc is Θ(√T).
1
Sources
50%
Confidence
Long-term
Relevance
11/18/2026
First Seen
Sources
Related Entities
Related Claims
UnverifiedCVaR_α measures the average loss of a random variable in the worst (1-α) fraction of cases; as α→1 it degenerates to the expected value, and as α→0 it approaches the worst-case cost.76% similarUnverifiedThe expected cost of a decision depends not only on the probability that the model makes an incorrect judgment, but also on the actual consequences when an error occurs.68% similarUnverifiedThe factor-of-two upper bound is a worst-case guarantee, and the actual savings observed in experiments indicate that the average case is often far better than this theoretical upper bound.66% similarUnverifiedThe theoretical analysis gives a lower bound: within the logarithmic statistical interval, there is a relaxation cost inversely proportional to the square; when c=1, the minimax regret is linear.66% similarUnverifiedAt fixed and pre-known evaluation times, the expected minimum cumulative excess prediction set size for online methods satisfying the hard coverage constraint is Θ(log T).65% similar
Cite This Claim
Stable URI
https://kongchang.com/claim/1182548API
curl https://kongchang.com/api/v1/knowledge/claims/1182548MCP
get_claim(id=1182548)