Unverified70% confidenceDecision RuleExact time
If the project is pinned to an older version of the ai package, blindly upgrading @ai-sdk/tui may cause peer dependency conflicts; it is recommended to confirm the version compatibility matrix before performing the upgrade.
2
Sources
70%
Confidence
Medium-term (~90 days)
Relevance
11/18/2026
First Seen
Valid until: 2/16/2027
Sources
Related Entities
Related Claims
UnverifiedDependency updates sometimes introduce version changes in transitive dependencies; if other packages in the project depend on different versions of ai, it may be necessary to check whether version conflicts exist.80% similarVerifiedIf a project has both ai and @ai-sdk/workflow pinned, both should be updated together to avoid type or runtime errors caused by version mismatches.78% similarUnverifiedIf the project also uses ai@7.0.136, it is recommended to upgrade the TUI package at the same time to avoid potential compatibility issues caused by a mismatch between the sub-package version and the core library.77% similarPartially VerifiedIf a project pins a newer @ai-sdk/provider-utils but still uses an older @ai-sdk/zai, upgrading @ai-sdk/zai is worthwhile; conversely, if the dependency tree has an older provider-utils version, upgrading zai alone is of little value.77% similarUnverifiedThe actual resolution result of the dependency tree depends on the lockfile and package manager; if the ai version is already pinned via overrides/resolutions in the project, the upgrade of @ai-sdk/tui may not pull the new core package in sync, causing a version mismatch.77% similar
Cite This Claim
Stable URI
https://kongchang.com/claim/1185564API
curl https://kongchang.com/api/v1/knowledge/claims/1185564MCP
get_claim(id=1185564)