Unverified50% confidenceDecision RuleExact time
If @ai-sdk/mcp@2.0.103 itself fixes issues or adjusts its internal implementation, these changes propagate to @ai-sdk/react through the dependency chain, so running the existing tests after upgrading remains a prudent practice.
1
Sources
50%
Confidence
Long-term
Relevance
11/22/2026
First Seen
Sources
Related Entities
Related Claims
UnverifiedAfter upgrading @ai-sdk/svelte, it is recommended to run the existing integration tests, especially the parts involving streaming responses and state management, to confirm that upstream core package changes have not affected the reactive update behavior on the Svelte side.79% similarUnverifiedFor production projects, after upgrading @ai-sdk/vue you should regression-test key paths such as streaming output, error retries and tool calls, rather than relying solely on the version number77% similarUnverifiedPatch updates in the dependency chain can still change runtime behavior through transitive dependencies; for example, @ai-sdk/openai-compatible adjusted how the usage field is accumulated in streaming responses in a patch version.75% similarUnverifiedFor teams already using @ai-sdk/voyage in production, patch versions can usually be upgraded with confidence, but it is still advisable to verify in a test environment that the return structure of embedding interfaces remains consistent.75% similarUnverifiedAligning this patch update of @ai-sdk/react with ai@6.0.336 is intended to narrow the intersection of version ranges, eliminate peer dependency warnings, and ensure consistency of the internal protocol between the hooks and the core SDK (such as the chunk format for streaming responses).75% similar
Cite This Claim
Stable URI
https://kongchang.com/claim/1197482API
curl https://kongchang.com/api/v1/knowledge/claims/1197482MCP
get_claim(id=1197482)