Expired80% confidenceEventTime unknown
In the website development test, Genspark took 5 minutes and consumed 200 credits.
1
Sources
80%
Confidence
Medium-term (~90 days)
Relevance
6/1/2026
First Seen
Valid until: 8/30/2026(expired)
Sources
Related Entities
Related Claims
UnverifiedIn the e-commerce website test, Opus 4.8 took approximately 50 minutes to complete while Fable 5 took approximately 35 minutes, with Fable 5 being about 15 minutes faster.70% similarUnverifiedIn real-world testing, GLM 5.1 restored a sketch into a runnable page at a speed close to 400 tokens per second, with the entire process from requirement to completed page development taking just over one minute.64% similarUnverifiedIn the webpage generation test, Claude (Opus 4.8) took over ten minutes, while MiniMax M3 took about half an hour.60% similarUnverifiedIn GLM-5.2's Thinking Mode, the first token takes 30 to 60 seconds to generate.59% similarUnverifiedThe framework generation time using structured prompts is approximately 5 minutes.58% similar
Cite This Claim
Stable URI
https://kongchang.com/claim/22115API
curl https://kongchang.com/api/v1/knowledge/claims/22115MCP
get_claim(id=22115)