Expired50% confidenceFactTime unknown
The later a problem is discovered, the higher the cost of fixing it, and the more modules involved, the repair difficulty and labor costs grow exponentially.
1
Sources
50%
Confidence
Medium-term (~90 days)
Relevance
7/2/2026
First Seen
Valid until: 9/30/2026(expired)
Sources
Introduction to Software Testing: A Complete Guide to Classification Systems and Core Concepts
bilibili字节软件测试
Related Claims
UnverifiedThe earlier a software problem is found, the lower the cost of fixing it; the difficulty and labor cost of fixing bugs found in later stages grow exponentially.80% similarUnverified内存颗粒数量越多,整体良率呈指数级下降,成本急剧攀升,是实现超大统一内存的工程挑战72% similarUnverified护栏设计的核心权衡是延迟成本——越复杂的检查逻辑,响应时间增加越多71% similarUnverified过度拆分状态节点会增加交接开销和维护复杂度70% similarUnverified推理时计算的扩展虽能提升单次输出质量,但成本以超线性方式增长,大规模部署往往难以经济可行70% similar
Cite This Claim
Stable URI
https://kongchang.com/claim/60277API
curl https://kongchang.com/api/v1/knowledge/claims/60277MCP
get_claim(id=60277)