Unverified50% confidenceBenchmarkExact time
IBM Systems Sciences Institute 研究数据显示,设计阶段修复缺陷成本为1x,编码阶段6.5x,测试阶段15x,生产环境100x
1
Sources
50%
Confidence
Long-term
Relevance
8/27/2026
First Seen
Sources
Related Entities
Related Claims
Partially VerifiedA classic IBM study shows that if defects introduced during the requirements phase are not discovered until the coding phase, the cost of fixing them is 6–10 times higher.75% similarUnverifiedResearch data from IBM and NASA shows that fixing a bug discovered during the requirements phase costs 10x to 100x less than fixing it during coding or testing74% similarUnverified研究显示修复嵌入架构深层的性能问题成本是在设计阶段预防的6至10倍65% similarUnverifiedAccording to IBM's classic research, approximately 85% of defects in software projects can be traced back to oversights during the requirements phase.60% similarUnverified左移测试的理念源于软件缺陷修复成本随开发阶段呈指数增长的经验法则59% similar
Cite This Claim
Stable URI
https://kongchang.com/claim/809671API
curl https://kongchang.com/api/v1/knowledge/claims/809671MCP
get_claim(id=809671)