Unverified50% confidenceFactExact time
The scheduling layer is responsible for deciding when to invoke which tool or sub-agent, and typically corresponds to the Planner or Orchestrator role
1
Sources
50%
Confidence
Long-term
Relevance
9/23/2026
First Seen
Sources
Related Entities
Related Claims
Unverified设计师应理解Agent的基础设施包括模型层、工具层、记忆层、编排层和观测层五个层次75% similarUnverifiedIn a hierarchical multi-agent system, there exists an Orchestrator agent responsible for decomposing tasks and dispatching work to downstream sub-agents74% similarUnverifiedThe Orchestrator is responsible for task decomposition, scheduling, and integration, while the Worker is responsible for executing specific, specialized tasks.71% similarUnverifiedIn a layered agent architecture, the top-level orchestration agent is responsible for decision-making and uses a powerful model, while the bottom-level execution agents handle repetitive work using mid-tier models.71% similarUnverified智能触发器的技术实现通常分为三层:条件监听层、语义理解层和任务执行层71% similar
Cite This Claim
Stable URI
https://kongchang.com/claim/945324API
curl https://kongchang.com/api/v1/knowledge/claims/945324MCP
get_claim(id=945324)