Unverified50% confidenceSolutionExact time
A complete data structure should be planned before adding features; otherwise, features added without a data plan will create hidden problems that require rebuilding later.
1
Sources
50%
Confidence
Long-term
Relevance
10/7/2026
First Seen
Sources
Related Entities
Related Claims
UnverifiedSpecific, actionable constraints (such as requiring immediate reporting upon detecting data anomalies and prohibiting self-repair) are more effective than vague role descriptions.70% similarUnverifiedUpdating a model with new data can destroy existing capabilities—known as catastrophic forgetting—and the industry integrates new data through failure case libraries, data augmentation, and mixed replay techniques.70% similarUnverifiedImportant data should be backed up before a system upgrade, as any system upgrade carries risks.68% similarUnverifiedWhen the database schema changes, the existing data generation scripts often need to be completely rewritten.66% similar
Cite This Claim
Stable URI
https://kongchang.com/claim/984185API
curl https://kongchang.com/api/v1/knowledge/claims/984185MCP
get_claim(id=984185)