Unverified50% confidencePredictionExact time
ITER is expected to achieve full-power operation in 2035.
1
Sources
50%
Confidence
Long-term
Relevance
9/10/2026
First Seen
Sources
Related Entities
Related Claims
Unverified国际热核实验堆(ITER)项目预计2025年前后才能完成建设并开始实验,距离商业化发电还有数十年77% similarUnverifiedBentley launched an electrification strategy called "Beyond100" in 2020, with the goal of transitioning its entire lineup to fully electric vehicles by 2030.64% similarUnverifiedIntel plans to introduce its 18A (1.8 nm class) process between 2025 and 2027.61% similarUnverifiedAs of 2024, Matter has iterated to version 1.3, adding support for device types such as energy management and electric vehicle charging.60% similar
Cite This Claim
Stable URI
https://kongchang.com/claim/888485API
curl https://kongchang.com/api/v1/knowledge/claims/888485MCP
get_claim(id=888485)